无码精品a∨动漫在线观看-国内精品乱码卡一卡2卡三卡-久久青草精品38国产-亚洲精品久久久无码一区二区-欧美性黑人极品hd变态

Hello, welcome to the official website of Dongguan Geally Refrigeration Technology Co., Ltd.! Message Product Map

ONE-STOP SERVICE PROVIDER FOR ICE MAKING EQUIPMENTS

Ice Making,Freezing and Refrigeration Technology
Hotline:
+86 769-81881389

Installation and acceptance points of ice block machine

Author:Dongguan Geally Refrigeration Technology Co., Ltd Date:2022-08-30 Reading:

Ice block machine is a kind of ice machine, which can be divided into direct cooling ice block machine and salt water ice block machine. The ice cubes produced are the largest in size among ice products, have a small contact area with the outside world, and are not easy to melt. It can be crushed into various forms of ice cubes according to different requirements. It is suitable for ice sculpture, ice storage, shipping, sea fishing, etc. After crushing, it can be used in all places where ice is used. However, after the ice is crushed, it will partially melt, and the amount of ice will be lost. Ice cubes can be divided into transparent ice cubes and milky white ice cubes. The following editor shares the content of the installation and acceptance points of the ice block machine, welcome to read!

Installation points of ice block machine:

1. To maintain horizontal placement

Ice block machine manufacturers suggest that a relatively standard spirit level should be prepared for corresponding measurement during installation, so that it can be kept in an absolute horizontal state, because only in this way can it maintain its performance and ensure the quality of ice making. The ice brick machine manufacturer also introduced that the ice brick machine should be moved to the determined installation position first, then placed on the top of the machine with a level, and then adjusted at the bottom until the level is displayed, and then the level is removed.

Second, to carry out the correct installation of the water system

Because the ice block machine has certain requirements for water quality when treating diseases, it should be connected to the tap water supply system that ordinary people can drink, and at the same time, it needs to be filtered before entering the machine. , because some ice cubes are drinkable directly, so more attention should be paid to this aspect. At the same time, the ice brick machine manufacturer reminds that the water supply system must meet the water temperature and water pressure within the specified range before it can be used normally, so that the machine can operate normally.

Third, to ensure that the power supply conditions meet the requirements

Before installing this aspect, the ice brick machine manufacturer reminds that you should read the instructions for use or the requirements indicated on the nameplate on the machine to ensure that the connected power supply is consistent with it. At the same time, in order to avoid the problem of electric shock, the grounding wire is an indispensable measure, and the manufacturer of the direct cooling ice block machine emphasizes that all wiring installations must be in accordance with the national standard requirements, and there can be no mistakes.

Acceptance points of ice block machine:

First, evaluate the quality of each part of the process

After receiving the ice block machine, the first task is to evaluate the craftsmanship and quality of its various parts. This is the basic premise for the device to show more solid functional effects, safety and reliability in the future, and the quality from the details. Quality can be a good evaluation of the strength and professional ability of the ice block maker brand in quality control.

Second, organize its related parameter data

Next, it is necessary to understand and organize the relevant parameter data of each part of the ice block machine and make relevant preparations. This is on the one hand to understand the specific performance, functional characteristics and characteristics of the equipment, and on the other hand, it is also for follow-up changes. The key to using it well and maintaining regularity in maintenance.

Third, the test run to observe the function performance

Of course, the next key is to test the relevant functions of the ice block machine with the support of professional personnel. Specifically, experienced technicians are used to power on the equipment and conduct trial operation according to the specifications. From its operation effect As well as the stability quality exhibited, a comprehensive and reliable acceptance conclusion can be drawn.

The scientific acceptance of ice block machine equipment is the premise of using it more reasonably and better later to complete the relevant high-quality quality. In short, its three main points mainly include evaluating the process and technical presentation quality of each detailed part of the equipment, and the equipment involved. It is also an effective method to evaluate the functional level and the sought after level of the ice block machine equipment to conduct a comprehensive understanding of the relevant parameter data obtained and do a good job of sorting and evaluation.

Thank you for reading. The above is an introduction to the installation and acceptance points of the ice block machine. Some of the contents are from the Internet and are for reference only. If you want to know more details about the ice block machine, please call for details and serve you wholeheartedly.


Share:
主站蜘蛛池模板: 欧美性xxxx狂欢老少配| 亚洲伊人五月丁香激情| 日韩夜夜高潮夜夜爽无码| 国产高清吃奶成免费视频网站| 精品亚洲国产成人av不卡| 男女又色又爽又爽视频| 久久精品视频在线看| 国产精品亚洲va在线| 亚洲国产精品久久久久制服 | 国产三级a毛视频在线观看| 日本高清二区视频久二区| 韩国三级大全久久网站| 国产明星裸体无码xxxx视频| 久久国产劲爆∧v内射-百度| 久久热最新网站获取| 国产成本人片无码免费2020| 在线永久看片免费的视频| 国产亚洲精品ae86| 乱人伦人妻中文字幕| 自拍偷区亚洲综合美利坚| 成人毛片100部免费看| 国产品无码一区二区三区在线| 欧美潮喷少妇100| 日木强大喷奶水av片| 国产后入清纯学生妹| 青青草国产成人久久| 亚洲中亚洲中文字幕无线乱码 | 亚洲精品久久久无码一区二区| 久久精品国产久精国产果冻传媒 | 午夜人性色福利无码视频在线观看| 亚洲精品一线二线三线区别大吗| 国产白丝精品爽爽久久蜜臀| 久久中文字幕人妻av熟女| 18禁黄网站免费| 亚洲欧美日韩成人一区在线| 狠狠色噜噜狠狠狠狠色综合久 | 天天爽夜夜爽人人爽曰| 欧美不卡一卡二卡三卡| 小鲜肉自慰网站xnxx| 熟妇人妻久久中文字幕| 未满十八18禁止免费网站|